Mercedes-Benz 4S Store PV Charging station in Xuzhou China
Project Details
PV:425kW Charging Station: 427kW
(1*360kW split machine-2 terminals, 2*30kW DC Charge Spots, 1*7kW AC Charge Spot)
The use of rooftop solar power generation, combined with municipal power supply, reflects the value of green energy; all PV green power is used by 4S stores and charging power stations;
CSCS central management system, photovoltaic-mains-charging integrated intelligently balances input and output power, dispatches photovoltaic charging stations and 4S stores' own electricity demand, and maximizes the efficiency of green energy use. CSCS has dramatically improved the operational efficiency of the photovoltaic field through online remote control and intelligent operation and maintenance in the background.